Smart City26 MLD SBR-based STP, Jhansi
Sequencing Batch Reactor STP with 4 sewage pumping stations & rising main for Jhansi Smart City Ltd. with 10-year O&M.
Smart CitySequencing Batch Reactor STP with 4 sewage pumping stations & rising main for Jhansi Smart City Ltd. with 10-year O&M.
TurnkeyDesign, engineering & construction of two 6m-high ash dykes (~7 km) with gabion work, LDPE liners and RCC/bitumen roads with Toshiba for UPRVUNL-Aligarh.
AMRUT 1.0149 MLD STP for Gwalior Municipal Corporation under AMRUT 1.0 with 100 km sewage network continuing 10-year O&M.
Satna Municipal CorporationSurvey, design, construction & commissioning of a comprehensive sewerage network with sump well, STP and HT feeder connection for Satna Municipal Corporation with continuing 10-year O&M.
Ongoing90 MLD raw water supply scheme for Gwalior Municipal Corporation in Madhya Pradesh — currently under execution.
SBR STPSequencing Batch Reactor (SBR) sewage treatment plant with allied civil and RCC works for Kannauj, Uttar Pradesh.
UPRVUNLTurnkey ash-water collection, treatment & conveyance up to 192 MLD for reuse at Obra, Kanpur & Anpara thermal power plants.
Singrauli Municipal CorporationSewer pipelines, manholes, appurtenances, STP, sump well, pumps, laterals and house connections with HT feeder and continuing 10-year O&M.
JV · Jal NigamConstruction of sewerage system with 3-month trial run in Sewerage District III for UP Jal Nigam.
RailwayExternal sewerage, drainage and water supply works including overhead water tanks for the Rail Coach Factory complex, Raebareli at Lalganj.
ReliancePump houses, water-retaining structures and buildings (GCW-2) for 600 MW Rosa Thermal Power Plant — the fastest unit completed on site.
OngoingUnderground drainage system for Dhule Municipal Corporation in Maharashtra — currently under execution.
From treatment plants to industrial infrastructure — let's discuss your next project.
Get in Touch